Beaver Problems?
BEAVERS PLUGGING CULVERTS, BEAVER PROBLEMS,
CULVERTS PLUGGED, PLUGGED CULVERTS.


BEAVERCONE PRODUCTS INTRODUCES; "THE BEAVERCONE"

(click on any image to enlarge)



CONE ORDER READY TO SHIP AUGUST 2011



CONE ORDER LOADED AND READY TO GO OUT WEST


Safety treatment ramp protected with beaver grid (New Highways Construction)
August 2006

The inventor demonstrates an easy clean out method.


 

"A 6" perforated culvert inserted (holes down) 6 feet into the culvert, the balance level out into the water is very helpful on small cones if you get a really eager beaver." 


"MUSKRAT CONE FOR AN ARCHED CULVERT IN MUSKOKA AREA"


"CONES STACK TOGETHER FOR EASY SHIPPING"

Many can be hauled on a small truck


A 2400mm Cone built for Dept. of Hwys Saskatchewan,
cone is split for shipping purposes, bolts together in 30 minutes


Building a 3100mm cone for Domtar, Ear Falls, Ontario. This cone will be split for shipping


GIVE THE "BEAVERCONE" A TRY, YOU WON'T BE SORRY.

MAIN PAGE - PRODUCT PICTURES - DEALERS - ABOUT BEAVERCONE

EXAMPLE OF CONE INSTALLATION


CONTACT US:
Beavercone Products
951 Crescent Road
Fort Erie, ON   L2A 4R6
CANADA
Telephone: 905-991-1509

cones@cogeco.ca